This series contains detailed handwritten project cost-estimate computations and project report drafts. These drafts identify the geographic location, terrain, and the general construction strategy for each project. The drafts of cost estimates consist of itemized mathematical formulas representing the cost of the projects. The "Planning Activities" folder contains a blueprint drawing of the excavation plan with project data for the Hari-Rud Project. This series is filed alphabetically by subject.
| BOX | FOLDER |
FOLDER TITLE |
DATES |
| 5 | 1 | Chasma I Shafa Spillway Estimate | [1973] |
| 2 | Computations of Cost Estimates | [1973] | |
| 3 | Cost Estimates Draft | [1973] | |
| 4 | Planning Activities | 1975 | |
| 5 | Projection Evaluation Draft | Nov. 1975 | |
| 6 | Qalagai Dam | [1973] | |
| 7 | Reservoir Projects Drafts | [1975] | |
| 8 | Site Project Drafts | [1975] | |
| 9 | Tangi Saidan Dam Construction Costs | [1973] |